Singapore municipal road repair site

5kW LESTAR Industrial Portable Power for On-Site Road Repair

LESTAR Industrial Portable Power Stations were deployed directly at a municipal road repair site in Singapore to provide on-site power for electric breaking equipment.

For mobile operations such as pavement breaking and localized road repair, 5kW industrial portable power stations are primarily used. The units can move with the crew and tools between repair points, reducing dependence on fixed power connections and fuel-powered generators.

Singapore | Municipal Road Repair | 5kW Mobile Power | ≤40 dB Operating Noise

01 Project Background

Where the Road Work Goes, the Power Follows

The project involved localized pavement breaking and road repair in Singapore. Crews used electric breaking equipment to remove existing pavement and moved between work points as the repair progressed.

LESTAR industrial portable power was deployed directly within the work area to provide electricity for on-site tools, reducing dependence on fixed power points during mobile operations.

Where the work goes, the power follows.

Electric road repair equipment and portable power

02 On-Site Deployment

5kW Portable Power Directly at the Work Point

For mobile road-breaking operations, 5kW-class industrial portable power stations are the primary configuration used in this project.

Industrial Portable Power Station is positioned close to the crew and electric tools. Once work at one location is completed, the unit can move with the crew to the next repair point.

Deploy → Plug In → Work → Move

This brings power directly to the work point, reducing dependence on distant fixed connections and long temporary cable runs.

Singapore road repair project

03 What Does a 5kW-Class Unit Provide?

PS-0505 as a Reference Configuration

In municipal road repair applications, the power source needs to support both continuous tool loads and the higher starting demand of motor-driven equipment.

5000W
Rated AC Output
5325Wh
LFP Battery Capacity
15000W / 2s
Peak Starting Power
IP54
All-Weather Protection
-20°C to 55°C
Operating Temperature

The 5kW rated output supports common electric tools used in road work, while 3× peak starting power helps handle the startup surge of motor-driven equipment.

LESTAR road repair equipment

04 How Long Can It Work on One Charge?

Official PS-0505 Runtime Reference

In addition to power output, runtime is an important consideration for mobile construction. According to PS-0505 runtime reference data, one full charge can support:

11.8 hours
Jackhammer
7.8 hours
350mm Cut-Off Saw
20.8 hours
110mm Cutter
32 hours
100mm Angle Grinder

Breaking, cutting and grinding tools are typically used intermittently as road repair progresses, allowing the mobile power source to be flexibly shared between different tools and work points.

05 Why Low-Noise Power Matters

Urban Road Work Should Not Add Unnecessary Power-Source Noise

Singapore’s National Environment Agency (NEA) includes road repair, road breaking, road opening and boring works within the scope of construction noise control. Construction sites within 150 metres of noise-sensitive premises such as residential buildings, hospitals and schools are also subject to noise-monitoring requirements.

LESTAR uses battery-stored energy without a continuously running combustion engine.

≤40 dB Power Station Operating Noise | 0 Engine Exhaust at Point of Use

LESTAR does not eliminate the noise produced by breakers and cutting tools themselves, but it reduces the continuous engine and exhaust noise associated with conventional fuel-powered generators.

Let the tool do the work — without adding unnecessary generator noise.

06 What Changed on Site?

Power at the Work Point

Mobile power is deployed directly within the road repair area, closer to the tools and crew.

Move with the Repair

Once one repair point is completed, the unit can move with the crew and tools to the next location.

Less Temporary Cabling

Bringing power closer to the tools reduces dependence on distant fixed connections and long temporary cable runs.

Less Power-Source Noise & No Engine Exhaust

Battery operation removes the need for a continuously running fuel engine, reducing additional power-source noise and eliminating engine exhaust at the point of use.

Road repair work in Singapore

07 Local Support in Singapore

From Real-World Deployment to Local Support

LESTAR has established a local service station in Singapore, supporting local contractors, municipal maintenance teams, industrial customers and distributors.

LESTAR Singapore local service station

Product Demonstration

Customers can see and test the equipment locally to evaluate compatibility with their own tools.

Solution Selection

Select the right mobile power configuration based on tool power, starting load, runtime requirements and actual working conditions.

Local Sales & Delivery

Local sales and delivery support make project purchasing and equipment delivery easier.

After-Sales Support

Our local team provides product support, operational assistance and after-sales service.

Demonstration | Selection | Sales | Delivery | After-Sales

Relevant Cas
Droits d'auteur ©  Nanjing Lestar Welding Science and Technology Co., Ltd. Propulsé par Raise