{"id":2868,"date":"2026-11-06T15:55:46","date_gmt":"2026-11-06T07:55:46","guid":{"rendered":"https:\/\/www.sfmpower.com\/?p=2868"},"modified":"2026-11-10T20:50:13","modified_gmt":"2026-11-10T12:50:13","slug":"sofimo-portable-power-nanjing-north-station","status":"publish","type":"post","link":"https:\/\/www.sfmpower.com\/fr\/updates\/sofimo-portable-power-nanjing-north-station\/","title":{"rendered":"Successful Delivery: SOFIMO Industrial Portable Power  Station Deployed at China Railway Construction Nanjing  North Station Site"},"content":{"rendered":"<p>.case-content h2 {<br \/>\n\tmargin: 32px 0 16px;<br \/>\n\tcolor: #000;<br \/>\n\tfont-weight: 700;<br \/>\n\tline-height: 1.3;<br \/>\n\tborder-left: 4px solid #f39820;<br \/>\n\tpadding-left: 14px<br \/>\n}<br \/>\n.case-content img {<br \/>\n\tdisplay: block;<br \/>\n\twidth: 100%;<br \/>\n\theight: auto;<br \/>\n\tmargin: 24px 0<br \/>\n}<\/p>\n<div class=\"case-content\">\n\t<img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"600\" class=\"alignnone size-full wp-image-2854\" src=\"https:\/\/cloud-1251007531.bcdn8.com\/lishida0924\/uploads\/2026\/11\/20261110071206383.jpg\" alt=\"\" \/><\/p>\n<p>In November 2026, the SOFIMO PS-0510 industrial portable power station was successfully delivered to the Nanjing North Station construction project of China Railway Construction Corporation Limited. Upon arrival on site, the construction team unboxed the unit and put it into immediate operation. Shipped directly from our factory to the frontline jobsite, the power station passed the most practical field test: reliable performance under real construction conditions.<\/p>\n<p><img decoding=\"async\" class=\"alignnone size-full wp-image-2854\" src=\"https:\/\/cloud-1251007531.bcdn8.com\/lishida0924\/uploads\/2026\/11\/20261110075758784.jpg\" alt=\"\" \/><\/p>\n<h2>Power That Moves With Your Worksite<\/h2>\n<p>For field crews, the value of portable industrial power hinges on whether it can keep pace with dynamic site workflows. Frequent relocation of work zones, limited access to fixed grid power, and the need for convenient power for hand tools and temporary lighting all directly impact on-site productivity.<\/p>\n<p>The SOFIMO PS-0510 is engineered specifically for these demanding temporary power scenarios. Powered by lithium iron phosphate battery storage, it can be relocated freely alongside shifting work areas to supply matched power tools, site lighting and other equipment. With 10342Wh battery capacity, 5000W continuous AC output and 15000W peak power (2s), and IP54 all-weather enclosure rated for rain, high temperature and dust resistance, the PS-0510 is built to survive harsh outdoor construction environments. Equipped with 10A \/ 16A industrial waterproof sockets, it unlocks flexible power beyond fixed grid points. For site teams, it delivers power that is <strong>mobile, connectable and easy to operate<\/strong>.<\/p>\n<h2>Powering the Global Shift from Diesel to Electric on Construction Sites<\/h2>\n<p>Worldwide, the construction industry is accelerating decarbonisation. Tightening local emission regulations, low-emission zone policies, net-zero project commitments and sustainability frameworks such as the World Green Building Council\u2019s Net Zero Carbon Buildings Commitment are pushing contractors to phase out fossil-fuel equipment on site. Reducing reliance on diesel generators has become a core priority for modern sustainable construction.<\/p>\n<p>Aligned with this global low-carbon transition, SOFIMO brings diesel-to-electric power replacement to daily site operations. Where load and recharging conditions permit, the PS-0510 replaces conventional diesel generators. It cuts fuel transport and refuelling work, eliminates local exhaust emissions and drastically reduces noise pollution to improve working conditions. The Nanjing North Station delivery marks another milestone for SOFIMO. Backed by in-house R&amp;D, factory production and full-lifecycle after-sales support, we help global engineering clients translate sustainable construction goals into practical power solutions for every work zone.<\/p>\n<p><img decoding=\"async\" class=\"alignnone size-full wp-image-2854\" src=\"https:\/\/cloud-1251007531.bcdn8.com\/lishida0924\/uploads\/2026\/11\/20261110075250501.png\" alt=\"\" \/><\/p>\n<h2>End-to-End Delivery &amp; Field Support for Reliable Jobsite Operation<\/h2>\n<p>This deployment for China Railway Construction demonstrates SOFIMO\u2019s integrated capability: from product development and manufacturing to turnkey project delivery. Drawing on our independent R&amp;D and production capacity, our team customises power solutions based on site load profiles, runtime requirements and equipment rotation schedules. We coordinate production, factory inspection and logistics so unit configuration and delivery timelines align with overall construction schedules.<\/p>\n<p>Once delivered, the unit is ready for fast commissioning. SOFIMO offers a complete on-site service package including operation training, routine maintenance and troubleshooting support. Robust hardware from our factory, paired with responsive field technical support \u2014 this is the foundation of SOFIMO\u2019s service promise for engineering partners.<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>.case-content h2 { margin: 32px 0 16px; color: #000; font-weight: 700; line-height: 1.3; border-left: 4px solid #f39820; padding-left: 14px } .case-content img { display: block; width: 100%; height: auto; margin: 24px 0 } In November 2026, the SOFIMO PS-0510 industrial portable power station was successfully delivered to the Nanjing North Station construction project of China [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":2854,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[52],"tags":[],"class_list":["post-2868","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-updates"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.sfmpower.com\/fr\/wp-json\/wp\/v2\/posts\/2868","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sfmpower.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sfmpower.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sfmpower.com\/fr\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sfmpower.com\/fr\/wp-json\/wp\/v2\/comments?post=2868"}],"version-history":[{"count":6,"href":"https:\/\/www.sfmpower.com\/fr\/wp-json\/wp\/v2\/posts\/2868\/revisions"}],"predecessor-version":[{"id":2887,"href":"https:\/\/www.sfmpower.com\/fr\/wp-json\/wp\/v2\/posts\/2868\/revisions\/2887"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sfmpower.com\/fr\/wp-json\/wp\/v2\/media\/2854"}],"wp:attachment":[{"href":"https:\/\/www.sfmpower.com\/fr\/wp-json\/wp\/v2\/media?parent=2868"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sfmpower.com\/fr\/wp-json\/wp\/v2\/categories?post=2868"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sfmpower.com\/fr\/wp-json\/wp\/v2\/tags?post=2868"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}